2395 Bayview Ave, Toronto (Bob Rumball Centre of Excellence for the Deaf)
Fida Restoration was contracted to complete concrete repairs inside the hydro vault and waterproof the deck slab with Tremco PUMA waterproofing system. Other miscellaneous works completed was the sandblasting and painting all the structural steel frames and grates with zinc rich paint and the installation of a new fire alarm in the hydro vault.
Fida Restoration was contracted to complete concrete repairs inside the hydro vault and waterproof the deck slab with Tremco PUMA waterproofing system. Other miscellaneous works completed was the sandblasting and painting all the structural steel frames and grates with zinc rich paint and the installation of a new fire alarm in the hydro vault.
Fida Restoration was contracted to complete concrete repairs inside the hydro vault and waterproof the deck slab with Tremco PUMA waterproofing system. Other miscellaneous works completed was the sandblasting and painting all the structural steel frames and grates with zinc rich paint and the installation of a new fire alarm in the hydro vault.